Installation In Upflow And Downflow Applications - Carrier 58MXA Installation, Start-Up, And Operating Instructions Manual

Deluxe 4–way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

4. Adjust outside nut to provide desired height, and tighten inside
nut to secure arrangement.
NOTE: Bottom closure must be used when leveling legs are used.
See Bottom Closure Panel section.
Step 2—Installation in Upflow and Downflow Applica-
tions
NOTE: For downflow applications, this furnace is approved for
use on combustible flooring when special base (available from
manufacturer) Part No. KGASB0201 ALL is used. Special base in
not required when this furnace is installed on manufacturer's Coil
Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is
used.
1. Determine application being installed from Table 1.
2. Construct hole in floor per dimensions specified in Table 1
and Fig. 13.
3. Construct plenum to dimensions specified in Table 1 and Fig.
13.
4. If downflow subbase (KGASB) is used, install as shown in
Fig. 14.
If Coil Assembly Part No. CD5 or CK5 or Coil Box Part No.
KCAKC is used, install as shown in Fig. 15.
NOTE: Remove furnace perforated, discharge duct flanges when
they interfere with mating flanges on coil on downflow subbase.
To remove furnace perforated, discharge duct flange, use wide
duct pliers or duct flange tool to bend flange back and forth until
it breaks off. Be careful of sharp edges. (See Fig. 16.)
FURNACE
CASING
WIDTH
Downflow Applications on Non-Combustible Flooring
Downflow Applications on Combustible Flooring Using
Furnace with or without CD5 or CK5 Coil Assembly or
17-1/2
Downflow Applications on Combustible Flooring NOT Using
Furnace with or without CD5 or CK5 Coil Assembly or
Downflow Applications on Non-Combustible Flooring
Downflow Applications on Combustible Flooring Using
Furnace with or without CD5 or CK5 Coil Assembly or
21
Downflow Applications on Combustible Flooring NOT Using
Furnace with or without CD5 or CK5 Coil Assembly or
Downflow Applications on Non-Combustible Flooring
Downflow Applications on Combustible Flooring Using
Furnace with or without CD5 or CK5 Coil Assembly or
24-1/2
Downflow Applications on Combustible Flooring NOT Using
Furnace with or without CD5 or CK5 Coil Assembly or
TABLE 1—OPENING DIMENSIONS (IN.)
APPLICATION
Upflow Applications
KGASB Subbase
KCAKC Coil Box
KGASB Subbase
KCAKC Coil Box
Upflow Applications
KGASB Subbase
KCAKC Coil Box
KGASB Subbase
KCAKC Coil Box
Upflow Applications
KGASB Subbase
KCAKC Coil Box
KGASB Subbase
KCAKC Coil Box
Fig. 13—Floor and Plenum Opening Dimensions
Do not bend duct flanges inward as shown in Fig. 16. This
will affect airflow across heat exchangers and may cause limit
cycling or premature heat exchanger failure. Remove duct
flange completely or bend it inward a minimum of 210° as
shown in Fig. 16.
NOTE: For 140 size unit when installed in downflow orientation,
cut the white jumper wire off between terminals PLl-6 and PLI-9.
PLENUM OPENING
A
16
15-7/8
15-1/8
15-1/2
19-1/2
19-3/8
18-5/8
19
23
22-7/8
22-1/8
22-1/2
14
A
PLENUM
OPENING
B
D
FLOOR
OPENING
C
FLOOR OPENING
B
C
24–1/8
16–5/8
19
16-1/2
19
16-3/4
19
16-1/2
24-1/8
20-1/8
19
20
19
20-1/4
19
20
24-1/8
23-5/8
19
23-1/2
19
23-3/4
19
23-1/2
A96283
D
24–3/4
19-5/8
20-3/8
20
24-3/4
19-5/8
20-3/8
20
24-3/4
19-5/8
20-3/8
20

Advertisement