Carrier 58MXA Installation, Start-Up, And Operating Instructions Manual page 43

Deluxe 4–way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

LOAD CALCULATION
_______
_______
_______
Furnace Model Selection
COMBUSTION AND VENT PIPING
Termination Location
_______
_______
Termination Kit — 2 Pipe or
_______
Combustion-Air Pipe Length
_______
Combustion-Air Elbow Quantity
_______
_______
Vent Pipe Elbow Quantity
Pipe Diameter Determined from
_______
_______
Pipe Sloped to Furnace
Pipe Insulation
_______
_______
Low-Ambient Exposed Pipes
CHECKLIST—INSTALLATION
Heating Load (Btuh)
Cooling Load (Btuh)
Roof or Sidewall
Concentric
Vent Pipe Length
Sizing Table
Over Ceilings
Condensate Drain
_______
_______
_______
_______
_______
CHECKLIST—START-UP
_______
_______
Thermostat Anticipator
_______
_______
Safety Controls Check Operation
_______
_______
43
Unit Level or Pitched Forward
Internal Tubing Connections Free
of Kinks and Traps
External Drain Connection Leak
Tight and Sloped
Condensate Trap Primed before
Start-Up
Heat Tape Installed if Required
Gas Input Rate
(Set Within 2 percent of Rating
Plate)
Temperature Rise Adjusted
Anticipator Setting Adjusted or
Cycle Rate (3 Cycles per Hr)
Selected
Primary Limit
Pressure Switch

Advertisement

Table of Contents
loading

Table of Contents