Performing The Gas Leak Tests - Samsung AR10FVSED Series User & Installation Manual

Table of Contents

Advertisement

Performing the gas leak tests

Make sure to check for gas leaks before completing the installation process (connecting the assembly pipe and hose between
Test part for outdoor unit
Tightening torque for body cap
(Refer to the table)
Charging
core
- R
: 2 2
Diameter of the screw
R
1 4 -
: A 0
Diameter of the screw
Tightening torque for charging port cap
(Refer to the table)
To check for gas leaks on the outdoor unit,
Check the valve A and B using a leak detector.
To check for gas leaks on the indoor unit,
Leak test with nitrogen (before opening valves)
In order to detect basic refrigerant leaks, before recreating the vacuum and recirculating the R410A, it's responsible of
installer to pressurize the whole system with nitrogen (using a cylinder with pressure reducer) at a pressure above 4 MPa
(40 bar) (gauge).
Leak test with R410A (after opening valves)
Before opening valves, discharge all the nitrogen from the system and create vacuum according to page 40~42.
After opening valves, check leaks using a leak detector for refrigerant.
Pump down (before disconnecting the refrigerant connections for unit repair, removal or disposal)
Pump-down is an operation intended to collect all the system refrigerant in the outdoor unit.
This operation must be carried out before disconnecting the refrigerant tubing in order to avoid refrigerant loss to the
atmosphere.
Turn the system on in cooling with fan operating at high velocity.
( Compressor will immediately start, provided 3 minutes have elapsed since the last stop).
After 2 minutes of operation, shut the suction valve with the same wrench.
Disconnect tubing. After disconnection, protect valves and tubing ends from dust.
Compressor damage may occur if run at a negative suction pressure.
MAX_XSA_IBIM_DB98-33747A_E.pdf
C
A
B
Test part for indoor unit
Before inspecting the leakage, use a torque wrench to close the cap for
the service valve. (Comply with a tightening torque for each size of the diameter,
and tighten the cap firmly to prevent any leakage.)
To check for any possible leakage, insert inert gas into the pipes connected to
indoor/outdoor units and check the connection part of the indoor/outdoor units
with soap lather or liquid for leakage test.
Spindle
Outer diameter
-
1 / 7
2 - 6
U 0
F N
/ 1 -
2 - 2
U 0
F N
1 N m = 10 kgf cm
D
Tightening torque
(mm)
Body cap
N (
) m
Ø 6 . 35
20 ~ 25
Ø 9.52
20 ~ 25
Ø 12.7
25 ~ 30
Ø15.88
30 ~ 35
Ø19.05
35 ~ 40
Charging port cap
N (
) m
10 ~ 12
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ar18fvsed seriesAr24fvsed seriesAr13fvsed series

Table of Contents