Startup and Test
Before turning on the unit, the following checks are to be performed by Qualified Personnel.
•
L1/R, L2/S, and L3/T are connected to the 3-phase input power.
•
T1/U, T2/V, and T3/W are connected to the motor.
•
The 3-phase input voltage is within the ASD setup tolerances.
•
There are no shorts and all grounds are secured.
•
With the previous checks confirmed, ensure that the direction of the motor rotation in the Bypass
mode and in the ASD-driven mode is consistent.
14
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.ctiautomation.net - Email: info@ctiautomation.net
Q7 Flow Installation and Operation Manual