Soak Away - Worcester Greenstar Heatslave II 12/18 Installation, Commissioning & Servicing Instructions

Floor standing oil fired condensing combination boiler balanced flue
Table of Contents

Advertisement

2
1
5
21.5mm Ø
Fig. 12 Disposal into a rainwater down pipe
Where the pipe terminates over an open drain or gully, the pipe should
terminate below the grating level, but above water level, in order to
minimise "wind chill" at the open end.
The use of a drain cover (such as those used to prevent blockage by
leaves) may offer further protection from wind chill.
Pipe drainage will be improved if the end is cut at 45° as opposed to a
straight cut.
2
1
5
21.5mm Ø
Fig. 13 External drain
4.4.2

Soak away

Condensate waste
▶ Care should be taken when siting a soak-away to
avoid obstructing existing services.
• The condensate drainage pipe may be run above or below the ground
to the soak away. The examples shown on this page run above
ground.
• The soak away must use a 100mm Ø plastic tube with two rows of
three 12mm holes on 25mm centres and 50mm from the bottom of
the tube. The holes must face away from the house.
• The tube must be surrounded by at least 100mm of limestone
chippings to a depth of 400mm.
Minimum hole size for the condensate soak away must be
400mm deep by 300mmØ .
In situations where there are likely to be extremes of temperature or
exposure, the use of a proprietary trace-heating system for external pipe
work, incorporating an external frost thermostat, should be considered.
If such a system is used, the requirement to use 32mm pipe does not
apply. However, all other guidance above and the instructions for the
trace heating system, should be closely followed.
Greenstar Heatslave II External
ErP -
6 720 813 345 (2014/09)
7
6
8
9
10
11
6
25mm min.
2
1
21.5mm Ø
12
13
Unsuitable for clay soil types.
Fig. 14 Disposal to a soakaway
Key to condensate soakaway
1
Condensate discharge from boiler
2
Universal connector
3
Soil and vent stack
4
Minimum 450mm and up to three storeys
5
Pipe work transition
6
Insulate and increase pipe size
12
100mm Ø minimum plastic pipe
13
Drainage holes
14
Limestone chippings (25kg min.)
15
Bottom of sealed tube
*
Condensate trap of 75mm already incorporated into the boiler
Pre-Installation
400mm min.
25mm min.
500mm min.
6
5
12
14
13
15
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents