Unscheduled Maintenance (System Interruption) - GE 345 Quick Start Manual

Transformer protection system
Hide thumbs Also See for 345:
Table of Contents

Advertisement

GENERAL MAINTENANCE
FASTPATH:

Unscheduled maintenance (system interruption)

76
To avoid deterioration of electrolytic capacitors, power up units that are stored in a de-
energized state once per year, for one hour continuously.
View the event recorder and oscillography for correct operation of inputs, outputs, and
elements.
345 TRANSFORMER PROTECTION SYSTEM – QUICKSTART GUIDE
CHAPTER 5: MAINTENANCE

Advertisement

Table of Contents
loading

Table of Contents