Terminal Strips Of The Cu230P-2 - Siemens SINAMICS BOP-2 Operating Instructions Manual

Basic operator panel 2
Hide thumbs Also See for SINAMICS BOP-2:
Table of Contents

Advertisement

2.1.2

Terminal strips of the CU230P-2

The wiring of the terminal strip is not shown completely, but as example for each terminal type.
If you require more than six digital inputs, use terminals 3 and 4 (AI 0) or terminals 10 and 11 (AI 1) as additional digital
inputs DI 11 or DI 12.
Wiring when using the internal power supplies.
Wiring when using external power supplies.
Wiring when using the internal power supplies.
Wiring when using external power supplies.
Frequency converters with Control Units CU230P-2; CU240B-2; CU240E-2
Getting Started, 01/2011, A5E02792536C AB
2.1 Interfaces of the Control Units
DI = high, if the switch is closed.
DI = high, if the switch is closed.
DI = low, if the switch is closed.
DI = low, if the switch is closed.
Installation
17

Advertisement

Table of Contents
loading

Table of Contents