Disassembling Procedures - Mitsubishi Electric CV-0MW7G21-92 Service Manual

Table of Contents

Advertisement

DISASSEMBLING PROCEDURES

● Disassembling procedures
In reverse of assembling procedures.
● Assembling procedures
1. PCB-AMP is installed in M005.
2. M004 is installed in the set united according to the procedure of 1.
The screw tightening does from Ⓒ, and tightens Ⓑ afterwards.
3. M001 and M002 are installed in the set united according to the procedure of 2.
4. M003 is installed.
Ⓑ x 3
Ⓓ x 6
Ⓒ x 5
M002 : CHASSIS-F
M004 :
HEAT-SINK-SUB
PCB-AMP
M005 : ASSY-CHASSIS
M003 : HEAT-SINK-MAIN
Ⓑ x 9
*Confirm the hooks of M002 are latched, insert M002.
(Be careful not to deform.)
2
Copyright (C) Mitsubishi Electric Corporation.
Ⓐ x 2
M006(1) : NAME-CARD(CV-0MW7G21-92)
M007(2) : NAME-CARD(CV-0MW7G21-93)
Don't stick on the bend hole and
*
the hollow of the chassis.
M001 : CHASSIS-R
(1) CV-0MW7G21-92
(2) CV-0MW7G21-93
No.
Screw
Tighten torque(N・m)
3X6
3X10
3X16
3X6
Your company internal use only.
CV-0MW7G21-92,-93
Model
0.8 +0.2/-0.1
0.8 +0.2/-0.1
0.8 +0.2/-0.1
0.8 +0.2/-0.1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents