Step 18 Dishwasher Wet Test - GE PDW9700N Installation Instructions Manual

Hide thumbs Also See for PDW9700N:
Table of Contents

Advertisement

Installation Instructions

STEP 18 DISHWASHER WET TEST

Turn on power supply (or plug power cord into outlet,
if equipped).
Start the unit to check for leaks.
PDW8200-PDW8900 Series:
– Latch door
– Push RINSE ONLY pad
– Push START/RESET pad one time
PDW9200-PDW9900 Series:
– Push RINSE ONLY pad
– Push START/RESET pad one time
– Close door
Check to be sure that water enters the dishwasher. If water
does not enter the dishwasher, check to be sure that water
and power are turned on.
Check for leaks under the dishwasher. If a leak is found, turn
off power supply, then tighten connections. Restore power
after leak is corrected.
Check for leaks around the door. A leak around the door
could be caused by door rubbing or hitting against
adjacent cabinet. Reposition the dishwasher if necessary.
See Step 11.
The dishwasher will drain and turn off about 5 minutes after
it was started. Check drain lines. If leaks are found, turn off
power at the breaker and correct plumbing as necessary.
Restore power after corrections are made. See Step 8
and 15.
Open dishwasher door and make sure most of the water
has drained. If not, check that disposer plug has been
removed and/or air gap is not plugged. See Step 15. Also
check drain line for kinking.
Run the dishwasher through another "Rinse Only" cycle.
Check for leaks and correct if required.
STEP 19 REPLACE TOEKICK BRACE AND
TOEKICK
• Replace toekick brace and attach with screws set aside
in Step 4 (the lower set of mounting holes may be used if
desired). Only for PDW9700 series and PDW9900 series.
• Place toekick against the legs of the dishwasher.
� � � � � � � � �
����������
Figure LL
������
���������
� � � � � � �
����������
������
Figure MM
• Align the toekick with the bottom edge and make sure it is
against the floor.
���������
• Insert and tighten the 2 toekick attachment screws. The
toekick should stay in contact with the floor.
Tip: Make sure toekick is against floor to minimize noise.
STEP 20 LITERATURE
• Be sure to leave complete literature package and Installation
Instructions with the consumer.
� � � �

Advertisement

Table of Contents
loading

Table of Contents