Delivery Checks; Specifications - EBARA DMLU Instruction And Operation Manual

Table of Contents

Advertisement

DMLU

Delivery Checks

Project:
When your pump is delivered, check the following items immediately.
1. Pump and accessories
a.) Confirm that no damage has occurred during transportation.
b.) Confirm that all items have been delivered.
2. Nameplate
a.) The basic specifications of the pump are listed on the nameplate. Read the pump nameplate to confirm
that the pump you received matches the specifications that you ordered.

Specifications

Liquid handled
Type
Temperature
Solids Capacity
Discharge size (in.)
Solid size (in.)
Materials
Impeller
Phase
Hz
Motor
Voltage
Starting Method
Protector
Mechanical Seal Lubricants
Maximum water depth
Installation
CALL 1-800-577-8111 FOR SALES AND SUPPORT
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Fig. 1 – Pump Nameplate
Item
Model:
Waste water
0 - 40° C
3, 4, 6
3
Cast iron
Three Phase
60 Hz
230 or 460 VAC
2.2kW : Direct start
3.7 ~ 22kW : Star-Delta start
2.2kW : Auto-cut
3.7 ~ 22kW : Thermal Protector
Turbine oil ISO VG32
26 ft.
with Quick Discharge Connector or Floor mounted
Chk'd:
Date:
Specifications

Advertisement

Table of Contents
loading

Table of Contents