Final Setup For Startup - Fetco CBS-2151XTS User Manual

Hide thumbs Also See for CBS-2151XTS:
Table of Contents

Advertisement

Final Setup for Startup

1. Turn on incoming water supply line and carefully inspect both inside and
outside of the brewer for leaks in all fittings and tubes
2. Turn on power.
3. Press the brewer's main power switch (located on the lower right of the back of
the equipment)
4. The water tank will begin filling. FETCO Home Screen #1 will read "FILLING".
5. When the water level rises and is sensed by the probe at the top of the tank the
heaters will activate
6. Heaters are automatically disabled until the tank is full.
7. While the water is heating Screen #2 "HEATING" will display and the actual
water temperature will be displayed.
8. After the water has reached the set temperature Screen #3 will display
"READY"
9. Review the Operating Instructions. Brew one full batch (water only) on each
side to confirm proper fill levels. The brewer is factory set with water only (no
coffee) to dispense the correct amount of water. If the actual volume is slightly
different from the programmed volume, fine tuning the brewer may be
necessary. See Calibrate Valves in the OUTPUT section in the
PROGRAMMING section.
10. Re-attach the covers after one final inspection for leaks. Look closely in the top
of the brewer section at the dispense fittings during this inspection.
Final Setup
SCREENS SHOWN TO THE RIGHT WILL APPEAR
22
FETCO Home Screen #1
"FILLING"
XTS
CBS_2132 3L
EXTRACTOR
TOUCHSCREEN
Ready
Touch
Heating screen
Filling
to
unlock™
Home Screen #2 "HEATING"
XTS
CBS_2132 3L
EXTRACTOR
TOUCHSCREEN
Ready
Tank Temp
197
Heating
Filling
FETCO Home Screen #3 "READY
XTS
CBS_2132 3L
EXTRACTOR
TOUCHSCREEN
Ready
Touch
Heating screen
Filling
to
unlock™
°F

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbs-2152-2xtsCbs-2152xtsCbs-2150xts series

Table of Contents