5
NOTES
5.1
NOTES FORM
It is recommended to note in this section Notes, with date and short description all the operations
performed on the UPS, as: maintenance, components replacement, abnormal situations, etc.
Date
Modifications reserved
GE_UPS_OPM_SGS_ISG_10K_40K_0US_V070.docx
Critical Power
Description
Done by
Page 46/46
Installation Guide SG Series 10-20-30-40 UL S