When the "EPO - Emergency Power Off" has been activated, the system must be restored as
follows:
Realize the push-button "EPO - Emergency Power Off" (contact on XB / 1, 4 is closed again).
Press the key "O" (Inverter OFF - Shut-down) on the Control Panel.
(see User Manual to Section 5.2).
In case of a Parallel System press the key "O" (Inverter OFF) on the Control Panel
of each unit connected on the Parallel Bus and having its output switch Q1
closed.
Modifications reserved