Where To Go From Here - 3Com Switch 4007R Getting Started Manual

Hide thumbs Also See for Switch 4007R:
Table of Contents

Advertisement

24
C
3: S
HAPTER
TARTING THE
Table 6 The EME LED Character Display During Power-on
Characters in Display Indication
random characters
none (blank display)
Diag
Cksm
Stby
Rdy
If you power on a power supply and it is not operat-
1
ing, the Character Display displays the following:
. Where x is the number of the power supply that is
x
not operating.
The installed switch fabric module Status LED flashes
2
green.
When the power-on phase has completed success-
3
fully, normal operation begins and switch fabric
module Status LEDs stop flashing and remain a steady
green. If one of the power-on diagnostic tests fails,
then the switch fabric module Status LED turns a
steady yellow.
The Switch displays the following message when the
4
management module is installed properly and the
RS-232 connection is made:
CoreBuilder 9000 Enterprise Management Engine
(vx.xx)
Copyright (c) 1999 3Com Corporation.
Login:
S
4007R
WITCH
Power-on has begun.
Power-on continues.
The EME is running self-diagnostic
tests.
The EME is calculating the checksum
value.
The EME is in standby mode, if it is a
backup.
The EME is active and ready, if it is a
master.
To continue operating and configuring your Switch,
5
see the CoreBuilder 9000 Enterprise Management
Engine User Guide.

Where to Go from Here

To verify that the Switch 4007R chassis and all
modules have been installed correctly, examine the
LED status on each module. To obtain information
about a module's LEDs and status indicators, see the
Getting Started Guide or Quick Start Guide for that
module.
Table 9 indicates what to do after you power on the
Switch.
PWR
For detailed information about the tasks that are
listed in Table 9, see the Enterprise Management
Engine Quick Start Guide for the CoreBuilder 9000
Enterprise Switch or the CoreBuilder 9000 Enterprise
Management Engine User Guide.

Advertisement

Table of Contents
loading

Table of Contents