Commissioning, inspection, maintenance
Further details regarding the individual steps
Note
Operate the appliance with uncontaminated combustion air to prevent operating
faults and damage.
CO
or O
content
2
2
■ The CO
content must be within the following limits (upper and lower output):
2
– 7.7 to 9.2 % for natural gas E and LL
– 9.3 to 10.9 % for LPG P
■ For all gas types, the O
If the actual CO
or O
2
following steps:
■ Carry out a tightness test of the balanced flue system, see page 35.
■ Check the ionisation electrode and connecting cable, see page 38.
Note
During commissioning, the combustion controller carries out an automatic calibration.
Only test the emissions approx. 30 s after the burner has started.
A
1. Connect a flue gas analyser at flue
gas aperture A on the boiler flue
connection.
2. Open the gas shut-off valve, start the
boiler and create a heat demand.
3. Select the lower output (see
page 49).
48
content must be between 4.4 % and 6.9 %.
2
values lie outside their respective ranges, proceed with the
2
(cont.)
4. Check the CO
2
actual value deviate from the above
ranges by more than 1 %, implement
steps from page 47.
5. Enter actual values into the report.
6. Select the upper output (see
page 49).
7. Check the CO
2
actual value deviate from the above
ranges by more than 1 %, implement
steps from page 47.
8. After testing, press OK.
9. Enter actual values into the report.
content. Should the
content. Should the