Site Preparation - Air Burners T-300 Operating Manual

Air curtain burner
Table of Contents

Advertisement

T-300
Air Curtain Trench Burner with Perkins 404D.22T or Kubota V2403-TE Engine
THE GOALS TO GOOD SITE PREPARATION ARE:
To locate the machine and fire pit for easy access
To sort the waste wood pile
To organize the inflow of new wood waste
When locating the machine and fire pit:
Consider access for your truck and trailer to deliver the machine. Ensure that there is
enough room to maneuver your vehicle. The (optional) ball hitch adapter may be re-
moved to use the pintle hitch in the field for towing by tractor.
Consider where the waste piles will be located. We generally recommend two waste
piles (explained in next section).
Consider the predominate wind direction. Hot embers will be escaping from the fire pit
during all burning operations.
Consider where and how (or if) you will empty the ash from the pit. If you plan to exca-
vate the ash out of the pit to empty it, ensure there is room and the soil conditions are
not too soft. If you are going to excavate the ash out, then consider where you will
dump it. In most cases cold ash can be reapplied to the land. Check your local authori-
ties.
DANGER:
This machine DOES NOT prevent hot embers from escaping.
This machine is designed primarily as a pollution control device to reduce
the smoke generated from burning clean wood waste.

SITE PREPARATION

Page 16 of 34
Air Burners, Inc.
OPERATING MANUAL
(Vers. 08.16)

Advertisement

Table of Contents
loading

Table of Contents