Air Burners T-300 Operating Manual page 22

Air curtain burner
Table of Contents

Advertisement

Air Burners, Inc.
T-300
Air Curtain Trench Burner with Perkins 404D.22T or Kubota V2403-TE Engine
OPERATING MANUAL
SITE PREPARATION
The "Two Pile System"
For an efficient operation you would have two piles:
The first pile or "main debris" pile, is the material being generated from the land clear-
ing or forest clearing operation and is located away from the ember path but with good
access to your loading machinery.
The second pile or "Good Wood" pile is your best and most burnable wood. When you
first setup the site the operator should spend some time sorting through the main de-
bris pile pulling out what appears to be your best and most burnable materials. This is
the material with which you will start the fire, this is the material that will give you a
good hot burning base fire. You will also draw from the "Good Wood" pile throughout
the day, if you should need to stoke up the fire (more on this in the following sections).
As the pit operator is drawing from the main debris pile throughout the day, he/she
should continue to replenish the "Good Wood" pile as necessary. The "Good Wood"
pile only needs to be enough material to stoke-up the fire, if needed and enough mate-
rial to get you started the next day.
Trench Burner positioned at a perfect pit
Page 18 of 34
(Vers. 08.16)

Advertisement

Table of Contents
loading

Table of Contents