Materials Needed - Bosch e103022 Installation Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Materials Needed

Electrical Supply Cable - Minimum #14
AWG, 2 conductor, 1 ground, insulated
copper conductors rated 75°C (167°F) or
higher.
Hot Water Supply Line - Minimum
3/8" O.D. copper tubing, PEX, or
metal braided dishwasher supply line.
Shut-off Valve and fittings appropriate
for hot water supply line (copper tubing/
compression fitting, or braided hose).
90° elbow with 3/4" N.P.T. female
threads on one leg, and sized to fit your
water supply line (copper tubing/com-
pression fitting, or braided hose) on the
other leg.
UL listed conduit connector or strain
relief.
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents