Cold Weather Operation - Stanley FMFP12704 Operation And Maintenance Manual

Coil roofing nailer
Table of Contents

Advertisement

Available languages

Available languages

SHINGLE GUIDE (FIG. 10, 11)
Adjust shingle guide (O):
1.
Loosen the adjusting lever (P) and slide the locking plate to desired position.
2.
Tighten adjusting lever firmly.
The
(O) can be used as an aid to position the shingle being nailed a
locking plate
specific distance (Q) from the front edge of the previous row of shingles (R) as shown.
Fig. 10
CLEARING A JAMMED NAIL (FIG. 1, 12)
Always disconnect air line from tool and remove fasteners
from magazine before making adjustments or personal injury may result.
If a nail becomes jammed in the nosepiece, keep the tool pointed away from you
and follow these instructions to clear:
1.
Disconnect the air supply from the tool.
2.
Lift the canister door latch (E) to open the nail
guide door (H).
3.
Open the canister door.
4.
Remove the jammed nail.
5.
Correct any deformation that may have
occurred to the nail coil.
NOTE: Should nails continue to jam frequently
in nosepiece, have tool serviced by an authorized
Stanley Black and Decker service center.

COLD WEATHER OPERATION

When operating tools at temperatures below freezing:
1.
Make sure compressor tanks have been properly drained prior to use.
2.
Keep tool as warm as possible prior to use.
3.
Make certain all fasteners have been removed from canister.
4.
Put 5 to 7 drops of non-detergent SAE 20 weight pneumatic tool oil in the air
inlet.
5.
Lower air pressure to 80 psi (5.5 bar) or less.
6.
Reconnect air and load nails into canister.
7.
Actuate the tool 5 or 6 times into scrap lumber to lubricate O-rings.
8.
Turn pressure up to operating level (not to exceed 120 psi) and use tool as
normal.
9.
Re-lubricate at least once daily.
10. Always drain the compressor tanks daily or after each use.