Install Equipotential Bonding Terminal - Daikin EKSV21P Installation Manual

Solar panel on-roof installation
Hide thumbs Also See for EKSV21P:
Table of Contents

Advertisement

3
x
Installation

3.4.7 Install equipotential bonding terminal

1. Release the slotted screws on the equipotential bonding terminal.
2. Connect the equipotential bonding
cable (not included in delivery).
3. Tighten the screws of the
equipotential bonding terminal.
4. Lay the equipotential bonding cable
to the equipotential bonding rail, fix
with cable ties and connect to the
equipotential bonding rail.
Installation instructions
32
WARNING!
The equipotential bonding terminal is not a substitute for a lightning rod. It is merely intended to protect the
solar panel temperature sensor. Local lightning strike regulations must be observed.
Fig. 3-48
Fig. 3-50
If two or more collector rows are installed, they must be connected by means of an equipotential bonding.
Equipotential terminals are:
contained in the package CON RVP and
in the package CON LCP.
Fig. 3-47
Work step 2 -
Fig. 3-49
Work step 2 -
Fig. 3-51
Work step 1
Work step 3 -
Work step 3 -
EKSV21P/EKSV26P/EKSH26P
Solar panels on-roof installation
008.1618444_00 – 12/2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eksv26pEksh26p

Table of Contents