Wiring Work - Samsung AM***FN1DEH series User Manual

Table of Contents

Advertisement

g Flexible hose Installation
Be horizontal
Indoor
Unit
Flexible hose
 Install horizontally
Indoor
Unit
Max. 30˚
 Max. allowable bending
angle
Drainpipe Connection
1.
The drain pipe should be installed within 100 mm from the
flexible hose, lift up from 100 mm to 550 mm and lift down
20 mm or more.
2.
Install horizontal drainpipe with a slope of 1/100 or more
and fix it by hanger space of 1~1.5 m.
3.
Install the air vent in the horizontal drainpipe to prevent
water flow back to the indoor unit.
Note
You may not need to install it if there were proper
slope in the horizontal drainpipe.
4.
The flexible hose should not be installed upward position,
it may cause water flow back to the indoor unit.
5.
Install U-trap at the end of the drainpipe to prevent a nasty
smell to reach the indoor unit.
Air vent
100 mm
300 mm or less
or more
Flexible hose
100~550 mm
or less
Centralized Drainage
1.
Install main air vent at the front of the farthest indoor unit from
the main drain when installed indoor units are more than 3.
2.
You may need to install individual air vent to prevent water
flow back at the top of each indoor unit drainpipe.
Hanger
Individual
Main drainpipe
air vent
46_ installing your air conditioner
Indoor
Unit
Max. 20 mm
 Max. allowable axis gap
Insulation
Connect
Connect to
to PVC
indoor unit
drain pipe
Insulation
PVC
drain pipe
Flexible hose
(Apply
(Apply adhesive on
adhesive on
the outside)
the inside)
 Handle with using adhesive not to
block the inside of flexible hose
1~1.5 m
Hanger
Horizontal drainpipe
more than 1/100 slope
Ceiling
1~1.5 m
Main air vent
550 mm or less
Centralized horizontal drainpipe
(more than 1/100 slope)

Wiring Work

Power and communication cable connection
1.
Before wiring work, you must turn off all power source.
2.
Indoor unit power should be supplied through the
breaker(MCCB, ELB) separated by the outdoor power.
3.
The power cable should be used only copper wires.
4.
Connect the power cable{1(L), 2(N)} among the units within
maximum length and communication cable(F1, F2) each.
5.
Connect F3, F4(for communication) when installing the
wired remote Control.
Outdoor
Unit
220-240V~
Indoor Unit 1
Indoor Unit 2
h ELB : Essential Installation
Selecting compressed ring terminal
B
Norminal
Norminal
dimensions
dimensions
Standard
Standard
Allowance
for cable
for screw
dimension
dimension
(mm)
2
(mm
)
(mm)
(mm)
(mm)
4
6.6
1.5
±0.2
3.4
4
8
4
6.6
2.5
±0.2
4.2
4
8.5
4
4
9.5
±0.2
5.6
Specification of electronic wire
Power supply
MCCB
ELB
Max : 242 V
X A, 30 mmA
X A
Min : 198 V
0.1 s
 Decide the capacity of ELB and MCCB by below formula.
The capacity of ELB, MCCB X [A] = 1.25 X 1.1 X ∑Ai
 X : The capacity of ELB, MCCB
 ∑ Ai : Sum of Rating currents of each indoor unit.
 Refer to each installation manual about the rating current of indoor unit.
 Decide the power cable specification and maximum length
within 10 % power drop among indoor units.
Coef×35.6×L
n
∑ (
1000×A
k=1
 Coef: 1.55
 L
: Distance among each indoor unit[m],
k
A
: Power cable specification[mm
k
Wired Remote
Control
Indoor Unit 3
Indoor Unit 4 Indoor Unit 5 Indoor Unit 6
h Ceiling, wall-mounted indoor unit.
Silver solder
D
d1
E F
L
Standard
Standard
Allowance
Allowance
dimension
Min. Min. Max.
dimension
(mm)
(mm)
(mm)
(mm)
+0.3
1.7
±0.2 4.1 6 16
4.3
-0.2
+0.3
2.3
±0.2
6 6 17.5
4.3
-0.2
+0.3
3.4
±0.2
6 5 20
4.3
-0.2
Power
Earth
Communication
cable
cable
2.5 mm
2.5 mm
0.75~1.5 mm
2
2
×i
k
k
10 % of input
) <
voltage[V]
k
], i
: Running current of each unit[A]
2
k
EEV kit
N
L
N
L
N
L
d2
t
Allowance
Min.
(mm)
+0.2
0.7
0
+0.2
0.8
0
+0.2
0.9
0
cable
2

Advertisement

Table of Contents
loading

Table of Contents