oticon miniBTE Instructions For Use Manual page 41

Table of Contents

Advertisement

• Make sure the ear mould and tubing are completely dry before they are reconnected
to the hearing instrument. Be careful that left ear mould and tubing are connected
to the hearing instrument with left ear marking and vice versa for the right ear
instrument.
Replacing the tubing
The tubing in the ear mould should be replaced when it becomes yellow or stiff.
Consult your Hearing Care Professional in relation to this.
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acto minibte

Table of Contents