Exploded Views 3 - Hitachi DV-PF2U Service Manual

Vhs type video recorder
Hide thumbs Also See for DV-PF2U:
Table of Contents

Advertisement

STEP
START-
/LOC.
ING
No.
No.
[33]
[2],[25] M Brake T Assembly
[34]
[2],[25] M Brake S Assembly
Tension Lever Sub
[35]
[34]
Assembly
[36]
[35]
T Lever Holder
[37]
[33]
M Gear
[38]
[2],[15] Sensor Gear
[39]
[33]
Reel T
[40]
[35]
Reel S
Moving Guide S
[41]
[31],[35]
Preparation
Moving Guide T
[42]
[32]
Preparation
[43]
[19]
TG Post Assembly
[44]
[19],[28] Rack Assembly
[45]
[44]
F Door Opener
*[46]
[46]
Cleaner Lever Assembly
*[47]
[46]
CL Post
(1)
(2)
(1): Follow steps in sequence. When reassembling, follow the steps in reverse order.
These numbers are also used as ldentification (location) No. of parts in the figures.
(2): Indicates the part to start disassembling with in order to disassemble the part in column (1).
(3): Name of the part
(4): Location of the part: T=Top B=Bottom R=Right L=Left
(5): Figure Number
(6): Identification of parts to be removed, unhooked, unlocked, released, unplugged, unclamped, or desoldered.
P=Spring, W=Washer, C=Cut Washer, S=Screw, *=Unhook, Unlock, Release, Unplug, or Desolder
e.g., 2(L-2) = two Locking Tabs (L-2).
(7): Adjustment Information for Installation
(+):Refer to Deck Exploded Views for lubrication.
* In case of some models, the Cleaner Lever Assembly is not used.
PART
Fig. No.
T
DM1,DM16 *(P-6)
T
DM1,DM16 *(P-7)
T
DM1,DM16
T
DM1,DM16 *(L-6)
T
DM1,DM16 (C-6)
T
DM1,DM16 (C-7)
T
DM1,DM16
T
DM1,DM16
T
DM1,DM17
T
DM1,DM17
T
DM1,DM17 *(L-7)
R
DM18
R
DM18
T
DM1,DM6
T
DM6
(3)
(4)
REMOVAL
REMOVE/*UNHOOK/
UNLOCK/RELEASE/
UNPLUG/DESOLDER
*(L-8)
*(L-9)
(5)
(6)
.
INSTALLATION
ADJUSTMENT
CONDITION
(+)Refer to Alignment
Sec.Pg.2-3-2
Type A
Type B
Type A
(7)
2-2-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents