Download Print this page

Webasto Air Top 3500 ST D Installation Instructions Manual page 11

Renault master/nissan interstar
Hide thumbs Also See for Air Top 3500 ST D:

Advertisement

80
1
1
4
1
2
Renault Master/Nissan Interstar
780
80
320
30
90
19
1
20
A/B
1
21
3
2
1
22
1
On vehicles with side trim:
The dimensions 40 mm and 60 mm are
specifications for a side panel that reaches
down to the floor panel.
Should a side panel be installed that does not
reach down to the floor panel, these
dimensions must be calculated in accordance
with the distance to the floor panel.
Cut out side trim as shown
Mount side trim. Push preassembled hot air
ducting A/B with 80/55 reducer onto
distributor 1.
Drill 2.5 mm hole through reducer and
distributor. Connect reducer and distributor
with self-tapping screw.
All vehicles
Shorten connection piece from air outlet by
approx. 10 mm on vehicles without side trim.
Mount cover piece 2 on air outlet 3. Mount air
outlet 3 with cover piece 2 on each hot air
elbow. Drill 2 2.5 mm dia. holes 1 each
2
through reducer and distributor. Connect
reducer and distributor with self-tapping
screw.
When drilling, watch components located
behind!
Copy hole pattern 1 from cover piece 3 to side
panel or trim in each case.
Copy hole pattern 2 from air outlet 4 to cover
3
piece 3 in each case.
2
1 2.5 mm dia. hole, self-tapping screw
[4x each]
2 2.5 mm dia. hole, self-tapping screw
[3x each]
Cutting out
side trim
Preassem-
bling distri-
bution
Installing
air outlet
Installing
air outlet
11

Advertisement

loading