Gree GEH09AA-K3DNA1B Service Manual page 76

Table of Contents

Advertisement

Service Manual
Steps
9. Remove electric box assy
Remove the screws fixing electric box
assy ; pull out each wiring terminal; lift the
electric box assy upwards to remove it.
Note:
When pulling out the wiring terminal, pay
attention to loose the clasp and don't pull
it so hard.
10. Remove soundproof sponge
Since the piping ports on the soundproof
sponge are torn easily, remove the
soundproof sponge carefully.
11. Remove 4-way valve assy
Unsolder the spot weld of 4-way valve assy,
compressor and condenser, and then remove
the 4-way valve assy .
Note:
When unsoldering the spot weld, wrap
the 4-way valve with wet cloth completely
to avoid damaging the valve due to high
temperature.
Installation and Maintenance
Procedure
Screws
Remove 4-way valve assy
Screws
Electric box assy
Soundproof
sponge
Screws
73

Advertisement

Table of Contents
loading

Table of Contents