Checking And Testing Operations - Samsung ASH070VE Installation Manual

Hide thumbs Also See for ASH070VE:
Table of Contents

Advertisement

Checking and Testing Operations

To complete the installation, perform the following checks and tests
to ensure that the air conditioner is operating correctly.
1
Review all the following elements in the installation:
Installation site strength
Piping connection tightness to detect any gas leakages
Connection wiring
Heat-resistant insulation of the piping
Drainage
Earthing wire connection
Correct operations (follow the steps below)
2
Press the On/Off button.
Result:
The indicator lights on the indoor unit flash at
half-second intervals.
While the indoor unit opens, the indoor unit fan runs
to start.
3
Press the
button.
Result:
The outdoor unit operates in cooling or heating mode as
following the room temperature.
4
Air flow direction
Press the
button one or more times to set the
blades to the 30° or 90° positions.
C
I
OMPLETING THE
NSTALLATION
17
E-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents