AFTER-SALES SERVICE
Before contacting After-Sales Service:
• Your full address.
1. See if you can solve the problem yourself (see
• Your telephone number and area code.
"Troubleshooting guide / after-sales service").
2. Switch the appliance on again to see if the
Note:
problem has been solved. If it has not,
The direction of door opening can be
disconnect the appliance from the power
changed. If this operation is performed by
supply and wait for about an hour before
After-sales Service it is not covered by the
switching on again.
warranty.
3. If the problem persists after this course of
action, contact After-sales Service.
Specify:
• The nature of the problem.
• The model.
• The Service number (the number after the
word SERVICE on the data plate on the inside
of the appliance)
ELECTRICAL CONNECTION FOR GREAT
BRITAIN AND IRELAND ONLY
Warning - this appliance must be earthed
Fuse replacement
If the mains lead of this appliance is fitted with a BS 1363A
13amp fused plug, to change a fuse in this type of plug use an
A.S.T.A. approved fuse to BS 1362 type and proceed as
follows:
1. Remove the fuse cover (A) and fuse (B).
2. Fit replacement 13A fuse into fuse cover.
3. Refit both into plug.
Important:
The fuse cover must be refitted when changing a fuse and if the fuse cover is lost the plug must not be
used until a correct replacement is fitted.
Correct replacement are identified by the colour insert or the colour embossed in words on the base of
the plug.
Replacement fuse covers are available from your local electrical store.
For the Republic of Ireland only
The information given in respect of Great Britain will frequently apply, but a third type of plug and socket
is also used, the 2-pin, side earth type.
Socket outlet / plug (valid for both countries)
If the fitted plug is not suitable for your socket outlet, please contact After-sales Service for further
instruction. Please do not attempt to change plug yourself. This procedure needs to be carried out by a
qualified technician in compliance with the manufactures instructions and current standard safety
regulations.
20
INSTRUKCJA UŻYTKOWANIA
PRZED PRZYSTĄPIENIEM DO EKSPLOATACJI
URZĄDZENIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
PORADY DOTYCZĄCE OCHRONY ŚRODOWISKA . . 90
ŚRODKI OSTROŻNOŚCI I WSKAZÓWKI OGÓLNE . . 91
OPIS URZĄDZENIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
OPIS PANELU STEROWANIA (Modele WBS4345) . . 93
OPIS PANELU STEROWANIA (Modele WBS4335) . . . 95
KOMORA CHŁODZIARKI . . . . . . . . . . . . . . . . . . . . . . . 97
KOMORA ZAMRAŻARKI . . . . . . . . . . . . . . . . . . . . . . . 99
PRZECHOWYWANIE ORAZ ROZMRAŻANIE
ŻYWNOŚCI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
KONSERWACJA I CZYSZCZENIE . . . . . . . . . . . . . . . 102
WAKACJE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102
INSTRUKCJA WYSZUKIWANIA USTEREK /
SERWIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
SERWIS TECHNICZNY . . . . . . . . . . . . . . . . . . . . . . . . 105
89
Need help?
Do you have a question about the WBS4345 and is the answer not in the manual?