Recommissioning The Inverter - SMA SUNNY TRIPOWER 12000TL-US Installation Manual

Hide thumbs Also See for SUNNY TRIPOWER 12000TL-US:
Table of Contents

Advertisement

Available languages

Available languages

11 Recommissioning the Inverter
11 Recommissioning the Inverter
If you have disconnected the inverter from all voltage sources (e.g. for configuration purposes) and
want to recommission it, proceed as follows.
Requirements:
☐ The inverter must be correctly mounted.
☐ All cables must be correctly connected to the terminals.
☐ Unused openings for the DC connection in the inverter enclosure must be closed with UL-listed
type 3R filler plugs.
☐ Unused openings for the Ethernet connection or the communication connection in the inverter
enclosure must be sealed tightly. The factory-mounted filler plugs can be used for that purpose.
Procedure:
1. Ensure that all DC cables are securely in place.
2. Reattach the DC protective cover. Tighten all
four screws with an Allen key (AF 3) in the order
1 to 4 (torque: 3.5 Nm (31 in-lb)).
3. Make sure that the AC cable is routed so that it cannot be damaged by the partition in the
lower enclosure lid.
4. Insert the lower enclosure lid from above and
flip it down. The screws must protrude from the
lower enclosure lid.
5. Tighten all six screws with an Allen key (AF 3) in
the order 1 to 6 (torque: 2.0 Nm (17.7 in-lb)).
By tightening the screws in the prescribed order,
you avoid warping the enclosure lid, which
would keep it from sealing correctly.
Useful hint: If the screws fall out of the lower
enclosure lid, insert the long screw into the lower
middle hole and the five short screws into the
other holes.
58
STPTL-US-10-IA-xx-17
SMA Solar Technology America LLC
Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents