Electrical Work - Mitsubishi Electric PMFY-P VBM-E Installation Manual

Air-conditioners for building application - indoor unit
Hide thumbs Also See for PMFY-P VBM-E:
Table of Contents

Advertisement

3. Refrigerant pipe and drain pipe
33
37
Fig. 3-5
Fig. 3-6
Fig. 3-7
Fig. 3-8

4. Electrical work

A Cover
B Electrical box
C
D
E Control board
F Address board
G Secure with the wiring clamp.
H
(mm)
Fig. 4-1
L N
M1M2 S
1 2
TB2
TB5
TB15
Fig. 4-2
the material with a band. (Both insulating material and band are supplied with
[Fig.3-5]
A Unit
B Insulating material 7
C
4
D
E Insertion margin
F Matching
G
H
I
J
4
K
[Fig.3-6]
A Drain port sectional view
B
4
C
D Insulating material 7
E Ceiling panel
In cases of upward drainage (Fig. 3-7)
Water drainage check (Fig. 3-8)
1. Fill the drainage pan with about 0.5 litres of water. (Do not pour water directly
drainage pipe.
A Ceiling panel
B Max. 60 cm
C Position of drain outlet
D
E
4.1. Electric wiring (Fig. 4-1)
*
4. Insert the wires into the electrical box.
from the unit during servicing.
6. Secure the wires with the wiring clamp on the side of the electrical box.
7. Replace the parts you have removed to their original locations.
or 60227 IEC 53.
the air conditioner installation.
Power cable size : more than 1.5 mm²
Warning:
conductors of the supply.
[Fig. 4-2]
A Switch 16 A
D Total operating current be less than 16 A
B Overcurrent protection 16 A
E Pull box
C Indoor unit
7 , then secure
B is 60 cm from the
F
G
H Drainage pipe vertical section
I
-

Advertisement

Table of Contents
loading

Table of Contents