5. FASTEN THE VERTICAL SUPPORTS to
the base using the long carriage bolts (O)
and nuts (N) (fig 7).
6. ATTACH THE FILTER BAG (B, fig 8) with
a belt clamp (C, fig 8) and hang it from the
support arm.
CAUTION: Use caution and wear gloves
when handling metal parts such as the belt
clamps, which can cut if handled carelessly.
7. ATTACH THE COLLECTION BAG with a
belt clamp (fig 9).
8. ATTACH THE HOSE (K, fig 10) to the
bottom of the impeller / separator assembly
(D) with a hose clamp (J).
9. FASTEN THE HOSE FITTING (I, fig11) to
the other end of the hose (K) with a hose
clamp (J).
12