Fitting the pipework
■ Manually bend flexible pipe into the
required shape.
■ Fit all connections with matching flat
gaskets.
■ Fit the fill valve.
16
1.
6.
3.
Note
If the pipework is to be connected on the
opposite side of the boiler, take this into
consideration when preparing for instal-
lation (see page 11).
5.
2.
4.