5. Tighten the screws with a #2 Phillips screwdriver to secure the switch in the rack.
Figure 4-1
Step 3: Checking the Installation
Before applying power perform the following:
•
Inspect the equipment thoroughly.
•
Verify that all cables are installed correctly.
•
Check cable routing to make sure cables are not damaged or creating a safety hazard.
•
Ensure all equipment is mounted properly and securely.
Installation
GS700TR Series Hardware Installation Guide
v1.0, December 2007
4-15