• Please tick the maintenance steps carried out and enter the test values into this log.
Maintenance steps
1.
Cleaned the boiler?
2.
Leak test carried out during operation?
3.
Function test carried out?
4.
Flue gas test:
Gross flue gas temperature
Ventilation air temperature
Net flue gas temperature
Carbon dioxide content (CO
Oxygen content (O
Carbon monoxide content (CO), free of air ppm _________ ppm _________
5.
Confirm maintenance
(company stamp, signature)
30
Maintenance log
) or
2
)
2
Date
t
[°C] ________ t
A
t
[°C] ________ t
L
(t
- t
) [°C] ____ (t
A
L
% ___________ % ___________
% ___________ % ___________
Date
[°C] ________
A
[°C] ________
L
- t
) [°C] ____
A
L
3060918_1203