Install the pipework between the boiler and the DHW cylinder in accordance with the
illustration below.
The DHW cylinder loading pump must supply from the top to bottom.
Note
Elbows
Ferrule with
union nut
Cylinder loading pump
incl. gaskets
Gravity brake
Filling / Draining
DHW outlet
DHW circulation
Cold water inlet
DHW cylinder to boiler pipework
3060918_1203
DHW cylinder to boiler pipework
Boiler flow
Boiler return
Hoses with gaskets
Sensor well for DHW
cylinder sensor
21