Installation Overview

Installation of the Opener

Caution:
*Be sure that the opener is installed in a level and paralleled position and is properly secured.
Improper installation could result in property damage, severe injury, and/or death.
* Before starting installation, ensure that there is no point of friction during the entire movement of
the gate and there is no danger of derailment.
* Ensure that the safety side panels are present.
Necessary Tools: The following tools
may be necessary to install the Gate
opener. You will need screwdrivers, an
electric drill, wire cutters and a wire
stripper, a socket set, and possibly
access to a welder.
When install the opener, you should
build a concrete pad to support the base
plate of opener in order to maintain
proper stability.
The installation proceeds are as
follows:
1.Dig a hole for a concrete pad which
should be approximately 50 x 30 x 35cm
(20〞x 12〞x 14〞). It may protrude 10
cm (4") above ground and 25 cm (10") in
depth underground. Increase the pad
height if necessary to protect the system
from flooding, heavy snow etc.
2. Prepare one or more conduits for the
electrical cables before pour concrete.
Remember that cable conduits have to
pass through the hole in the base plate.