Installation Precautions - Mirage SERIES A Installation And Operating Instructions Manual

Table of Contents

Advertisement

INSTALLATION PRECAUTIONS

The Mirage Gas Appliance installation and venting must conform
to the current CAN/CGA-B149 installation code (in Canada) or the
current National Fuel Gas Code, ANSI Z223.1 (in the USA), and
approved per local codes. Only qualified (licensed or trained)
personnel should install this product.
For Mobile Housing installation, the installation must conform to
the current CSA Z240.4 installation code (in Canada) or the Stand-
ard for Manufactured Home Installations, A225.1/NFPA 501A. (in
the U.S.A.), and approved per local codes. Only qualified (licensed
or trained) personnel should install this product.
Fig # 8
PART #
f i r e - p a r t s . c o m
VENT SYSTEM
Before starting installation of vent kits , the installer should read these
instructions to insure that the proper vent system has been selected for
the installation.
Vent systems approved for use with the Mirage Direct Vent are shown
in Figure 8. Approved vent systems components are labelled for
identification. NO OTHER VENTING SYSTEMS OR COMPONENTS
MAY BE USED.
Connections between each vent system component must be tightly
joined and sealed, and secured with sheetmetal screws at each joint.
Consult your local Building Codes before beginning the installation.
CAUTION: UNDER NO CONDITION SHOULD COMBUSTIBLE
MATERIAL BE CLOSER THAN 1-INCH FROM THE VERTICAL AND
HORIZONTAL SECTIONS OF THIS VENT SYSTEM.
PART DESCRIPTION
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents