Page 1
DIRECT VENT ROOM HEATER SERIES A INSTALLATION AND OPERATING INSTRUCTIONS f i r e - p a r t s . c o m WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.
Contents CAUTION ..................3 SAFETY ..................3 MAINTENANCE ................3 LIGHTING INSTRUCTIONS ............4 OPERATING .................. 5 GAS FLAME ADJUSTMENT ............5 GAS SUPPLY ................. 6 ELECTRICAL ................. 6 BLOWER OPERATION..............6 f i r e - p a r t s . c o m CLEARANCES ................
FOR YOUR SAFETY - Do not install or operate your Pacific Energy the Company or by any of its employees or representatives for any Mirage without first reading and understanding this manual. Any damages caused by an inoperable, inadequate, or unsafe condi-...
FOR YOUR SAFETY READ BEFORE LIGHTING WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. A. This appliance has a pilot which must be lighted by hand. - If you cannot reach your gas supplier, call the fire When lighting the pilot, follow these instructions exactly.
OPERATING Extend Shutdown: 1) Partially depress and turn gas control dial clockwise past “PILOT” to “OFF” position. Once a pilot light has been established, the unit may be operated one To re-light unit, see “lighting instructions” section. of two ways: Note: When lit for the first time, the appliance will emit a slight odour for Fig.
GAS SUPPLY CLEARANCES The Mirage Gas Appliance comes equipped with a flexible 3/8" N.P.T. The minimum clearances from the appliance to combustibles are shown Male inlet for easy gas connection. This connector is located behind the on Fig. # 8. For purpose of servicing, a 12" right side (side with controls) left side panel.
CAN/CGA-B149 installation code (in Canada) or the Vent systems approved for use with the Mirage Direct Vent are shown current National Fuel Gas Code, ANSI Z223.1 (in the USA), and in Figure 8. Approved vent systems components are labelled for approved per local codes.
Fig. # 9 f i r e - p a r t s . c o m STRAIGHT THROUGH WALL top of the collar up to the crimp-bead and attach with three sheetmetal screws. Seal the joint with high temperature silicone. Next, slide the 7-inch outer pipe over the 5-inch pipe fully and secure to the pipe collar with three sheetmetal screws.
CORNER INSTALLATION 1) Determine the exact position of the gas stove, making sure the unit will be set at 45° to the walls and the corner clearance will not be less then 1-inch. The vent pipe should be centered (if possible) between two building members.
3) Continue adding vent components per the pre-planned system con- The Mirage direct vent appliance may be installed on a combustible floor. figuration. Support spacer must be used for each 6-feet of vertical and If the appliance is to be installed on flooring that may make the unit horizontal run.
VENT TERMINAL INSTALLATION 1) Install the vent terminal on the outside wall. When placing the vent terminal, make sure the collars on the terminal inserts into the Fig. # 14 corresponding vent pipe. 2) Attach terminal to the wall with screws at each corner. (see Fig. #14) NOTE: THE VENT TERMINAL MUST BE POSITIONED SO THAT THE FLUE OUTLET IS POINTING UP.
LOG SET Fig. # 16 The log set comes installed in the appliance from the factory. If the logs have to be removed for cleaning, they must be handled carefully as they are very fragile. To re-install the log set, follow this procedure: Back Log 1) Place the back log on the rear tabs of the burner assembly, with flat side facing rear and bark side forward.
DV CONTROL DOOR ............ 5 A GAS CONTROL KNOB EXTENSION ......36 PEDESTAL COVER ............6 BURNER CONTROL KNOB ........... 37 'MIRAGE' LOGO (not shown) ........7 CONNECTOR FITTING ..........38 TOP LOUVER ..............8 FLEX INLET PIPE (not shown) ........39 A BOTTOM LOUVER ............