Download Print this page

Installation Of Outdoor Unit - Toshiba RAV-SP404AT-E Installation Manual

Hide thumbs Also See for RAV-SP404AT-E:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Super Digital Inverter
Serial installation in front and rear
Open above and to the right and left of the unit.
The height of an obstacle in both the front and rear of the unit
should be lower than the height of the outdoor unit.
Standard installation
1,000 or
300 or
more
more
1,500 or
2,000 or
more
more

Installation of Outdoor Unit

Before installation, check the strength and horizontalness
of the base so that abnormal sounds do not emanate.
According to the following base diagram, fix the base
firmly with the anchor bolts.
(Anchor bolt, nut: M10 x 4 pairs)
200 or
more
As shown in the figure below, install the foundation and
vibration-proof rubber pads to directly support the bottom
surface of the fixing leg that is in contact with and
underneath the bottom plate of the outdoor unit.
*
When installing the foundation for an outdoor unit with
downward piping, consider the piping work.
Fixing leg
Foundation
Foundation
If only the end of the
fixing leg is supported, it
may deform.
Foundation
Set the out margin of the anchor bolt to 15 mm or less.
10
90
600
108
Ø25 Drain hole
GOOD
GOOD
Support the bottom surface of the
fixing leg that is in contact with and
underneath the bottom plate of the
outdoor unit.
NO GOOD
15 or less
90
Absorb vibration
with vibration-proof
rubber pads
Bottom plate of
outdoor unit
Do not support the
outdoor unit only with
the fixing leg.
EN

Hide quick links:

Advertisement

loading