Zephyr TYPHOON AK2100 Use, Care And Installation Manual page 8

Hide thumbs Also See for TYPHOON AK2100:
Table of Contents

Advertisement

8
1. Align folded edge to cabinet base and
wall corner
2. Mark 2 hanging bolt drill locations (A) on
cabinet (see template on page 7).
3. Mark 2 bracket drill locations (for
anchors) (B) on wall.
INSTALLATION
4. Remove template and drill location (A)
with 1/4" or 3/8" drill bit.
5. Install EZ anchors to (B) as marked.
(see next diagram for EZ anchor
installation).

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TYPHOON AK2100 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Typhoon ak2136

Table of Contents