5. Turn off 115-v power to furnace.
6. Reconnect inducer motor wire harness. Reinstall furnace
access door.
7. Turn on 115-v power to furnace.
8. Reset thermostat to desired temperature.
1. Put away tools and instruments. Clean up debris.
2. Verify flame rollout manual reset switch has continuity.
3. Verify that blower and main access doors are properly
installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer's instruc-
tions.
6. Review User's Manual with owner.
7. Leave literature packet near furnace.
47

CHECKLIST