Chapter 3 Installation; Site Preparation; Package Contents - NETGEAR SW502 Installation Manual

Table of Contents

Advertisement

Chapter 3
This chapter describes the installation procedures for the NETGEAR Model SW502 and Model
SW507 switches.

Site Preparation

Before you begin installing the switch, prepare the installation site. Make sure the operating
environment meets the physical requirements of the switch. The ambient temperature must be
between 0 ° C and 40 ° C (32 ° F and 104 ° F). The maximum relative humidity must not exceed 90%.

Package Contents

Unpack the contents of the package and verify them against the following list:
Model SW502 switch or Model SW507 switch
This installation manual
Owner registration card
Rack Mount kit
AC power cord
CAUTION: Use the appropriate power cord as required by your national electrical codes
and ordinances.
The package for the Model SW502 switch contains these additional items:
BNC T-connector
50 Ω BNC terminator
Call your dealer if there are any wrong, missing, or damaged parts. Keep the carton, including the
original packing materials, to repack the switch if there is a need to return it for repair.
To qualify for product updates and product warranty registration, fill in the Owner Registration Card
and return it to NETGEAR, Inc.
Installation
Installation
3-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sw507

Table of Contents