Appendix B Safety and Regulatory Compliance
Information
Choose a site with a dry, clean, well-ventilated and air-conditioned area.
Choose a site that maintains an ambient temperature of 32 to 104
2. Creating a Safe Environment
Connect AC-powered systems to grounded power outlets or as per local regulations.
Do not move or ship equipment unless it is correctly packed in its original wrapping and
shipping containers.
Only allow Harmonic trained personnel to undertake equipment service and
maintenance. Do not permit unqualified personnel to operate the unit.
Wear ear protection when working near an NSG Pro platform for a longer period of time.
3. Rack Mounting the Unit
Install the system in an open rack whenever possible. If installation in an enclosed rack is
unavoidable, ensure that the rack has adequate ventilation.
Reliable earthing of rack-mounted equipment should be maintained. Particular attention
should be given to supply connections other than direct connections to the branch circuit
(e.g. use of power strips). This unit should be mounted at the bottom of the rack if it is the
only unit in the rack.
When mounting this unit in the partially filled rack, load the rack from the bottom to the
top with the heaviest component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before mounting or
servicing the unit in the rack.
The rack must be anchored to an immovable support to prevent it from tipping when the
unit is mounted on it. The rack must be installed accoring to the rack maufacturer's
instructions.
Disconnect all power and external cables before lifting the unit. Depending on the weight
of the unit, more than one person might be required to lift it.
4. Power Considerations
a.
AC Power
b. DC Power
5. Handling Fiber Channel Cables
Always read and comply with the handling instructions on the shipping container.
Follow all ESD precautions and approved fiber cleaning procedures.
© 2014 Harmonic Inc. All rights reserved.
Adding to the system a UPS (Uninterrupted Power Supply) and an AVR (Automated
Voltage Regulator) is highly recommended.
Installing the main power supply by a qualified electrician, according to power
authority regulations. Make sure all powering are wired with an earth leakage,
according to local regulations.
It is recommended to install the encoder within 1.5m (approximately 5 feet) from an
easily accessible grounded AC outlet.
When the encoder is rack-mounted, ensure that the rack is correctly grounded.
Ensure a suitable overcurrent device is in-line between the equipment and the power
source.
Connect DC-input power supplies only to a DC power source that complies with the
safety extra-low voltage (SELV) requirements in the UL60950-1, CAN/CSA-C22.2
No. 60950-1-03, AS/NZS 60950-1, EN/IEC 60825-1, 21 CFR 1040, EN 60950-1,
and IEC 60950-1 standards.
Ensure that power is removed from the DC circuit before installing or removing
power supplies
24
Site Preparation Instructions
o
o
F (0 to 40
C)
Ellipse 3000 Release 3.3, Rev A

Advertisement

Table of Contents
loading

Related Products for Harmonic Ellipse 3000

This manual is also suitable for:

Proview 8100Proview 8100 release 1.3.1

Table of Contents