Powering Up And Initialization - Harmonic Ellipse 3000 Installation Manual

Hide thumbs Also See for Ellipse 3000:
Table of Contents

Advertisement

Chapter 1 Ellipse™ 3000 Installation Guide

Powering Up and Initialization

Prior to powering up the Ellipse, ensure that all cabling is correctly connected (see
on page 9). Verify that the unit is connected to the main power supply and grounded
Installation
according to the instructions.
Upon power-up, the user will hear the internal fan begin operation and see the front panel LCD
display activated.
Once the Ellipse is powered up, the unit begins an automatic initialization procedure, which
includes loading of the embedded system parameters. This process takes approximately
30 seconds.
© 2014 Harmonic Inc. All rights reserved.
11
Powering Up and Initialization
Electrical Power
Ellipse 3000 Release 3.3, Rev A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proview 8100Proview 8100 release 1.3.1

Table of Contents