Chapter 1 Ellipse™ 3000 Installation Guide
Powering Up and Initialization
Prior to powering up the Ellipse, ensure that all cabling is correctly connected (see
on page 9). Verify that the unit is connected to the main power supply and grounded
Installation
according to the instructions.
Upon power-up, the user will hear the internal fan begin operation and see the front panel LCD
display activated.
Once the Ellipse is powered up, the unit begins an automatic initialization procedure, which
includes loading of the embedded system parameters. This process takes approximately
30 seconds.
© 2014 Harmonic Inc. All rights reserved.
11
Powering Up and Initialization
Electrical Power
Ellipse 3000 Release 3.3, Rev A