CLEANUP AND START-UP INSTRUCTIONS
1.
Start furnace using procedure outlined on Lighting Instructions attached to furnace. Observe operation of furnace through at least 1 complete
heating cycle controlled from the room thermostat. Observe cycle for 20 minutes or until a status code is flashed. If status code flashes, refer to
the Index.
2.
Recycle as necessary and check thermostat heat anticipator setting, gas input rates, and temperature rises. These procedures are outlined in
Installation, Start-Up, and Operating Instructions.
3.
Check operation of safety devices: limit switch and flame rollout switch.
4.
Put all setup switches in their proper positions.
5.
Remove tape from the door switch.
6.
Replace thermostat leads (if necessary).
7.
Set thermostat in AUTO position, calling for heat.
8.
Set thermostat to desired temperature.
9.
Replace the blower access panel and furnace door. Clean up.