GENERAL

Before installing your new stove, check that the
chimney is clean and clear of obstructions, cracked
brickwork and leaking joints should be made good.
The chimney should have a cross sectional area of
at least 176 sq.cm. or an inner diameter of 15 to 23
c.m. A similar direct air inlet is required in the room
to support combustion. Do not connect to a chimney
serving another appliance. Always ensure that the
connection is to a chimney of the same size - never
connect to one of smaller dimensions.
The complete installation must be done in accor-
dance with current Standards and Local Codes. It
should be noted that the requirements and these
publications may be superseded during the life of
this manual.
PRE-INSTALLATION ASSEMBLY
Step 1: after removing the stove from its pack, open
the fire door and remove the contents from the fire
box. Separate the coal burning parts from the wood
burning parts. See exploded drawing.
Step 2: Lay the stove on its side and fit the 4 legs
1 /4
(item 1) with the
" (6.4mm) hex sets screws pro-
vided, tighten screws. Stand the stove upright, tak-
ing care not to strain the leg bolts.
Step 3: COAL BURNING. Install the Side Bricks (8)
one at each side of the boiler and press them out to
the sides (7).
Step 4: Install the Coal Grate (19) and push it back
so that the legs rest on the pads of the base (3).
Step 5: Install the Ash Pan (21) between the grate
legs and push it back towards the back of the stove.
Step 6: Close the fire door (6) to ensure that the
grate (19) is installed correctly.
Step 3a: WOOD BURNING. Install the Back Baffle
(25) with the 4 holes at the top.
Step 4a: Install the Side Bricks (8) one at each side
of the boiler and push them back to retain the back
baffle (25).
Step 5a: Install the Hearth Plate (26) with the flat
face upwards.
Step 6a: Install the Fire Fence (24) with the long top
plate facing outwards and the end lugs between the
side bricks (8) and the front frame (17).
Step 7: Install the Hot Plate (16) into the large
opening of Hob (14). Do not remove the hot plate
when the stove is lighting.
Step 8: Attach the spigot (15) to the back panel (12)
or the hob (14) as required with the
countersunk screws provided. Fit the back sealing
plate (18) to whichever opening is not used.
WARNING: All the above parts must be fitted
to the stove before firing.
3. Base

INSTALLATION INSTRUCTIONS

FLOOR PROTECTION

When installing this heater on a combustible floor, a
floor protector, consisting of a layer of non-com-
bustible material at least
(6.4mm) thick covered with sheet metal is required
to cover the area under the heater and to extend to
at least 18" (457mm) a the front and 8" (203mm) to
the side and rear and this will provide protection
from sparks and embers which may fall out from the
door when stoking or fuelling.
3
1 /4
" (6.4mm)
1. Leg
2. Ashtray
3 /8
" (9.5mm) thick or
1 /4
"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents