Installation; Unpack, Prepare The Wall & Boiler - Potterton Performa SL HE Installation & Service Instructions Manual

Condensing central heating boiler
Table of Contents

Advertisement

4. Installation

Cut with
MINIMUM CLEARANCE
3° Rise
Core Drill
Flue Hole
Centre Line
Centre Line
105mm (4")minimum
Flow
Return
or
127mm (5")
mimimum
for Internal
Fitment Kit
STAND OFF KIT-
Top Mounting Points
WALL MOUNTING BRACKET
Drill and plug - 7 mm
Secure using woodscrews supplied
Key Installation Points -
Refer to the Installation & Service and/or Flue Kit Instructions for more information.
Condensate Pipe - This must be plastic and always slope
The dimensions shown ensure the flue is
!
!
continually downwards from the boiler by at least 50 mm
installed with the correct rise of 53 mm
in every metre (approx. 2.5˚).
in every metre (approx. 3˚) from the boiler.
No air breaks are required in the condensate pipe.
Boiler
Termination via internal discharge
'A'
branch e.g. sink waste - downstream
Dimension 'A'
Dimension 'B'
vertical
centre of flue
elbow to inside
offeset required
Sink
of wall
100 mm
5 mm
Pipe must terminate above
500 mm
27 mm
1000 mm
53 mm
water level but below
1500 mm
79 mm
surrounding surface
105 mm
2000 mm
2500 mm
131 mm
3000 mm
158 mm
3500 mm
184 mm
Boiler
Termination to a drain or gully
Front Clearance
Pipe must terminate
!
above water level but
275 mm
below surrounding
surface
15 mm
Operational
clearance
Boiler Mounting
and
Boiler
Termination to an internal soil
and vent pipe
610 mm
Servicing
clearance
Bracket
450mm Min
For the boiler to operate correctly all air must
!
be vented from the system prior to
commissioning and the system itself must
be suitably vented.
Boiler
Termination to a purpose made soak-away
500mm Min
Holes in the soak-away
must face away from
the building
BOILER SECURING POINT
Drill and plug - 7 mm
Secure using woodscrew supplied
or optional Anti-theft kit
STAND OFF KIT-
Bottom Mounting Points
Centre Point
Gas
connection
BOILER OUTLINE
Centre Line
Gas
Centre Line
Condensate
MINIMUM CLEARANCE
Boiler Securing Point
Boiler Mounting Bracket
Fig. 33
26
MINIMUM CLEARANCE
'B'
Woodscrews
BOILER OUTLINE
Woodscrew
MINIMUM CLEARANCE
or
Anti-theft kit
Lifting points
in base of packing
4.1
Unpack & Prepare the Wall & Boiler
These instructions assume you have chosen a
suitable boiler location which will also allow
correct installation of the condensate and flue
systems.
1. Carefully unpack the boiler, leave the
packing around the base of the boiler
fitted. Do not discard other packaging until
all the items are accounted for and/or the
boiler is installed.
2. Place the mounting template in the proposed
boiler position ensuring that it is level.
Minimum clearances, fixing points,
pipework centrelines and flue incline are
all accounted for on the template.
3. Mark the flue hole, mounting bracket fixing
positions (two), boiler securing point and
pipework centre lines then remove the
template.
4. Drill (7 mm drill) and plug the three mounting
holes.
Drill (on an incline, approx. at least 1.5° to
ensure the condensate drains back to the
boiler) a 105mm diameter hole for the flue
through the wall or a 127mm diameter hole if
the Internal Fitment Kit is being used.
5. Secure the mounting bracket to the wall
using two No. 12 x 2" woodscrews
(supplied).
6. Lift the boiler by the packing at the base
onto the mounting bracket.
7. Remove the packing from the base and
square boiler to the wall using the alignment
screws on the back panel. Pull the door panel
down and remove the two securing screws.
Slide off the controls cover assembly and put
safely aside.
8. Ensure the boiler is secured to the wall
(using the third No. 12 x 2" woodscrew)
through the hole in the bracket at the rear of
the boiler case.
Note: The anti-theft securing kit (Part No.
238035POT) may be used in place of the
third woodscrew if required.