Download Print this page

Advertisement

Quick Links

IBM TotalStorage NAS 200
Model 25T
Quick Start Instructions

Advertisement

loading

Summary of Contents for IBM TotalStorage NAS 200 25T

  • Page 1 IBM TotalStorage NAS 200 Model 25T Quick Start Instructions...
  • Page 2 First Edition (October 2002) © Copyright International Business Machines Corporation 2002. All rights reserved. US Government Users Restricted Rights – Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.
  • Page 3 2. Visually inspect the unit to ensure that it was not damaged during shipping. If any items are missing or damaged, contact your IBM representative. Step 2: Unpack the box...
  • Page 4 One set of documentation including: Caution: Safety Information – Read This First, IBM TotalStorage NAS 200 Hardware Installation Guide, Quick Start Instructions and product and documentation CD-ROMs. Rack configuration only v One rack installation kit including: Cable-management assembly, cable straps, cable ties, cage nuts, clip nuts, screw packages and slide rails and Rack Mounting Instructions.
  • Page 5: Step 3: Install The Appliance

    2. Insert the cage nuts using a screwdriver or the cage-nut insertion tool (or slide on the clip nuts) into each marked hole. ™ IBM TotalStorage NAS 200Model 25T Quick Start Instructions...
  • Page 6 3. Align each slide rail to the rack using the pin as a guide. Then bolt the slide rails to the rack using the M6 screws provided. 4. Attach the hinge bracket to the rear of the rack using the M6 screws provided.
  • Page 7 6. Secure the appliance to the rails using the M4 screws provided. Unscrew the rack-support wheels and store them in a safe place. Go to “Step 5: Attach cables (Rack configuration)” on page 7. ™ IBM TotalStorage NAS 200Model 25T Quick Start Instructions...
  • Page 8 Step 4: Attach cables (Tower configuration) 1. Connect the engine to your network by plugging the network cables to the Ethernet ports and then into your network. Connect each power cable to the receptacles on the back of the engine and then to different power source outlets.
  • Page 9 Ethernet ports and then into your network. Connect each power cable to the receptacles on the back of the engine and then to different power source outlets. 2. Route the cables through the cable-management assembly on the rack. ™ IBM TotalStorage NAS 200Model 25T Quick Start Instructions...
  • Page 10 Step 6: Complete the installation Rack configuration only Complete the installation by sliding the engine into the rack until the release latches snap shut. Then insert the M6 screws provided through the release-latch-bracket assembly on either side of the engine. Note: Inserting the M6 screws is required if the rack is moved or in a vibration-prone area.
  • Page 11: Step 8: Software Configuration

    Log on to the appliance using the following ID and password: v User ID: Administrator v Password: password Set the appliance’s date and time using Windows Control Panel. 2. Change the computer name of the appliance (optional) ™ IBM TotalStorage NAS 200Model 25T Quick Start Instructions...
  • Page 12 Set a unique name for the appliance. For example: NAS200. 3. Set up storage To set up storage, you will need the following tools: ™ v ServeRAID manager to create arrays and logical drives v Disk Management to write signatures, create partitions and assign drive letters 4.
  • Page 13 Java and all Java-based trademarks and logos are trademarks or registered trademarks of Sun Microsystems, Inc. in the United States, other countries, or both. Other company, product, and service names may be trademarks or service marks of others. © Copyright IBM Corp. 2002...
  • Page 14 NAS 200 Model 25T Quick Start Instructions...
  • Page 16 Printed in U.S.A.