Mitsubishi Electric MFZ-KA-VA Technical Data Book page 28

Heat pump air conditioners
Hide thumbs Also See for MFZ-KA-VA:
Table of Contents

Advertisement

PEAD-RP35EA2
PEAD-RP50EA
PEAD-RP60EA
Model
A
B
C
D
E
RP35,50
772
305
-
830
804
RP60
1012
280
290
1070
1044
Initial flare nut size
Refrigerant piping flare connection (liquid
1
Refrigerant piping flare connection (gas G copper tube):LP
2
Drain R1(External thread)
3
Electrical parts box
4
Drain Pump (Option)
5
Drain Pipe (Option) ... Flexible joint VP-25(I.D. 32)
6
7
Filter
In case of rear inlet
Air inlet
7
Keep duct-work length 850mm or more.
Be sure to apply the air filter
near the air inlet grille.
In case of bottom inlet
PEAD-RP71EA
A
B
C
D
E
Model
RP71
1012
280
290
1070
1044
Initial flare nut size
Refrigerant piping flare connection (liquid 9.52 copper tube):HP
1
Refrigerant piping flare connection (gas F copper tube):LP
2
Drain R1 (External thread)
3
Electrical parts box
4
Drain Pump (Option)
5
Drain Pipe (Option) ... Flexible joint VP25(I.D. 32)
6
Filter
7
Air inlet
7
Keep duct-work length 850mm or more.
Be sure to apply the air filter
near the air inlet grille.
F
R410A Outdoor unit : 6.35
R410A Outdoor unit : 12.7
R407C Outdoor unit : 9.52
R407C Outdoor unit : 15.88
Outdoor unit (SUZ) : 6.35
15.88
R407C Outdoor unit : 9.52
F copper tube):HP
Set
640
30
30
61
227
10
4
10
1
2
Air outlet
Air outlet
7
3.5
40
176
15
256
Air inlet
(Unit : mm)
F
15.88
Set
30
680
30
53
169
10
2
1
Air outlet
4
(Unit : mm)
G
Service space:500 or more
29
450
50~150
55
81
Access door
13
44
75
243
6
5
3
81
Service space:500 or more
29
450
50~150
55
81
Access door
81
13
44
75
243
6
5
3
28
10- 3 (RP35,50)
12- 3 (RP60)
A
C
B
81
Lifting bolt hole
(14 22)
10- 3 (RP35,50)
C
B
81
12- 3 (RP60)
A
E
13
30
D
10- 3 (RP35,50)
12- 3 (RP60)
C
B
81
A
12- 3
A
81
C
B
Lifting bolt hole
(14x22)
12- 3
C
B
81
A
E
13
D
30
Unit : mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents