Completing The Test Procedures - Motorola BT100 Installation And Operation Manual

1 ghz broadband telecommunications amplifier
Table of Contents

Advertisement

4-4
Bench Testing
Example:
11.2 dB (measured gain)
+ 1.0 dB (equalizer insertion loss)
+ 1.1 dB (power combiner)
+ 0.0 dB (pads)
+ 4.6 dB (cable simulator at 40 MHz)
17.9 dB (unit gain)

Completing the Test Procedures

The amplifier is now approximately tailored for a specific field location. Additional adjustments
after installation are minor in nature. Re-install the fuses removed during testing.
Complete station records by recording pertinent information. Remove test-equipment
connections and close the housing following instructions provided in Section 5, "Installation,"
Closing the Housing.