Space Requirements - Develop ineo 223 Quick Manual

Table of Contents

Advertisement

1.9

Space requirements

1.9
Space requirements
To ensure that machine operation, consumables replenishing, part replacement, and regular maintenance
can easily be performed, adhere to the recommended space requirements detailed below.
25-7/8 (658)
5-7/8
(150)
7-5/8
(194)
4-3/16
(107)
NOTICE
Be sure to allow a clearance of 3-15/16 inches (100 mm) or more at the back of this machine for the ventilation
duct.
ineo 223/283/363/423
64-5/16 (1634)
38-7/16 (976)
ineo 423/363/283/223+DF-621+PC-208+FS-527+SD-509
51-15/16 (1320)
38-7/16 (976)
ineo 423/363/283/223+DF-621+PC-208+FS-529
42-5/8 (1083)
38-7/16 (976)
ineo 423/363/283/223+DF-621+PC-208+JS-505
46-3/4 (1187)
11-9/16
32-13/16 (834)
(293)
3-15/16
(100)
Unit: inch (mm)
46-3/4 (1187)
11-9/16
32-13/16 (834)
(293)
3-15/16
(100)
Unit: inch (mm)
46-3/4 (1187)
11-9/16
32-13/16 (834)
(293)
3-15/16
(100)
Unit: inch (mm)
1
1-25

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ineo 223 and is the answer not in the manual?

This manual is also suitable for:

Ineo 283Ineo 423Ineo 363

Table of Contents